Greenacres in Poynings have started a house extension works which will take about 12 to 18 months depending on weather conditions. Part of the works are to put in a basement. The equipment they’re going to need for this AND in order to allow the equipment to come through the back rather than the front of the house (nearer the village) needs its own road built to allow access. This ‘road’ is currently being built across their wildflower meadow and is temporary. The meadow will be reinstated at the completion of the works.
If anyone has any issues with the works or building contractors please contact Dean as he don’t wish the village to be disturbed.